May 31- June 6th, 2015 site visit
Contents
Instal evap pan
- field calibrate
- edit program
- for platform
- exterior grade plywood - home depot will cut it
- exterior deck screws
- calibrate in mm to get units in mm
Wind sensors replacement
- calculate multiplier for wind direction sensor. for back calculation purposes
- Replace wind direction sensors
- align (declination: 18.5 degrees)
- North (0/360 degrees) when nose points AWAY from box, for both sensors
aligned in office so that when nose faces same way as box, reads 180.
- to install propeller, hand tighten then tighten with channel locks
- both wind sensors can use same excitation port
- White = 5106, Black = 5103
Telemetry
Finish installing radio + ethernet for redundancy
- old RF310B is in WQ in computer racks to left after enter
- black box with campbell scientific marking
- put timer on power source
- radio connected to CR3000 with CS10 port gets power from this port as well
- check config settings on NL201 nl201.toolik.uaf.edu should be:
- HwAddr: 00:D0:2C:02:0D:73.
- IP address: 137.229.91.81
- Subnet MASK: 255.255.255.192
- Default Gateway/Router:137.229.91.65
- for NL100 I'm bring up
- HwAddr (MAC address): 00d02c0004c0
- IP address: 137.229.91.82
- Subnet MASK: 255.255.255.192
- Default Gateway/Router:137.229.91.65
Items to bring up
- alcohol swabs AND lens cloth
- compass
- outlet timer for old radio
- NL100
- smart phone
- evap gauge
- two RM young wind sensors
- sleeping bag
- nut driver for tower base
- drill + charger
- tube for leveling platform
- wood and screws for platform
- zip ties
- null modem cable for NL100 communication
- cat5 cable and tools for creating connectors
- wire to power NL100 from CR3000 AND ac adapter if outlet space
- field laptop + charger
- laptop + charger
- plywood boards
- field notebook
- camera
- tool bag
- fish tape
- electrical tape
- ethernet-usb plug
- serial-usb plug
- rag
- cable housing
- pertinent manuals
- extension chord
- disc
- printed copies of the plan
- gloves
Items to purchase
- alcohol swabs
- power strip
- compass
- 32 AA batteries for GardenCam
- plywood +screws for base
Tipping tower
- grab 2 saw horses
- undo one guy wire, loosen others
- undo one leg bolts, loosen others
- 2 bolts on each leg, take off both on one leg, just loosen bottom screw for other 2 legs
- CAREFUL of sensor wires when lowering tower
- have WD40 with me in case can't get wind sensor screws undone
when raise tower, make turnbuckles taught but not too tight
PLAN
Telemetry
- plug in timer to old radio base
- check config settings on NL201 in CPS shed
- run cat5 line from radio in CPS shed
- leave NL100 in enclosure, wire power from data logger or outlet
- (grab ladder against back of tool shed to look into box)
Wind Sensors + Garden Cam
- Alignment
- which way does tower tip and how is crossbar oriented
- stake out east west
- Tip Tower
- Reset Garden Cam
- remover flash drive (may need to cut tape for this)
- download pics
- clear drive
- Replace Wind sensors
- use old mounts or change if necessary
- screw on propeller, hand tighten then tighten with channel locks
- alignment ring then sensor
- zip tie wires and pull them into box
- Wire Sensors
' RM Young 5103 Wind Monitor (black)
' Red Wire -- CR3000 P1
' Green Wire -- CR3000 SE1
' Blue Wire -- CR3000 VX1
' Clear Wire -- CR3000 AG
' Black Wire -- CR3000 AG
' White Wire -- CR3000 AG
' RM Young 5106 Wind Monitor(white)
' Red Wire -- CR3000 P2
' Green Wire -- CR3000 SE2
' Blue Wire -- CR3000 VX1
' Clear Wire -- CR3000 AG
' Black Wire -- CR3000 AG
' White Wire -- CR3000 AG
- Download data files from CR3000
- upload new program
- Align Wind sensors on ground as best as possible
- first horizontal plane
- second east-west
- Raise tower
- have Brie climb it to align sensors if necessary
- Replace batteries in Garden Cam power case (24 AA batteries)
Evaporation Gauge
- Build platform with pallets and plywood
- attach gauge to pan with pipe
- run wire through housing and into enclosure
- ' Evaporation Pan
- ' White Wire -- CR3000 SE16
- ' Red Wire -- CR3000 VX3
- ' Black Wire -- CR3000 Signal Ground
- Calibrate
- Fill pan partway with water, measure height with ruler in mm
- Measure voltage by reading the EvapLevelTemp variable on the program
- Add more water, measure water depth in pan
- Measure voltage
- Calculate multiplier and offset using y = mx+b
- m(multiplier) = (height1-height2)/(voltage2-voltage1)
- b(offset) = height1-(m*voltage1)
- Change multiplier and offset in program
- download data
- upload new program
Additional tasks
(grab ladder against back of tool shed to look into box)
- download CR3000 + radio device config settings
- level and alcohol swab radiometer (par)
- level and alcohol swab 3 radiometers on old tower (net Rad, UVA, UVB)
- Pluvio
- Hole in mesh to craw in, 3 captive screws holding on outer shield
- REQUIRES TROX 20 Screw driver
- empty most of water inside plastic inner tub
- remove any dead animals
- Hole in mesh to craw in, 3 captive screws holding on outer shield
- note any damage
- Make sure no water in battery box
- inspect seals where wires go in
- inspect solar panels
TODO
TELEMETRYPR and purchase stuffupdate program for evap pan, wind sensors, snow depth quality numberprogram NL100evap gauge base supplies and logisticslearn ethernet cable connectorsGardenCam (how reset? what does PI want?)figure out where wind sensor go on data logger, and how to mountre-align wind sensor from basement- read pluvio manual
find photo of evap pan baseask toolik for palletsnew longer cable for wind sensorinstal skype on iphoneget wind sensor mounting pole from basementcheck types of wind instrumentswrite out plan- pack
check how long cable on evap gauge is