NGEE September 2015 Barrow
Revision as of 14:46, 23 September 2015 by 137.229.29.230 (talk)
Barrow trip:
Contents
To Bring:
- Survey GPS
- Survey Rod
- Survey Tripod
- UPS
Monday
- fly up
- survey extents of camera again
- take down tower
- go does his work
Tuesday
- we move tower back out to cake eater road
- put batteries back at A site
- battery backup at control shed
- replace dreamplug
- visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
- Ship tower back to Fairbanks
Wednesday
- Return to Fairbanks