NGEE Nome April 2016 pt2
Revision as of 08:59, 19 April 2016 by imported>Bob
Contents
Field Plans
- First day on site set up tag line for surface water discharge measurements
 - Snow survey at ___ points across the watershed (still deciding)
 - survey water surface daily
 - measure discharge once there is measurable flow in the creek
 
- build bridge across creek
 - look for Bob's camera
 - water quality sampling
- gps positiong
 - note time of day & date
 
 
Safety Gear
- life jackets
 - throw bag
 - dry suit
 - zipper cleaner and gasket cleaner for dry suit
 - boots
 - helmets
 - aviation safety bags
 
in 106
- plywood
 - aluminum pipe
 - drill & batteries
 
shopping
- two hole deals for bridge
 
Field Gear
- make a bridge from unistrut for creek access
- 6 or 9 5' pieces of unistrut plus wooden planks, bolt together using strut nuts
 
 - velocity probe
- Sontek
 - Flo-Mate
 - wading rod
 - waders
 - dry suit
 
 - survey tripod
 - total station for stage readings?
- need a taller rod for the prism
 - or, track down optical level.
 
 
Day 1
- take out bridge and related supplies
 - bring out survey tripod
 - start water quality sampling & discharge measurements after setting up bridge
 - if there is still snow at the valley bottom, consider adding additional cameras to the tripods.
 
Day 2
- depending on how day one goes.. maybe drop off towards top of basin. Hike down to road measuring snow depth with an avalanche probe
 - at the bottom, finish day by measuring discharge in the creek
 
Stuff i moved to NGEE conex
- survey poles
 - yellow dry survival bag
 - drill case & batteries & bit
 - staff gauges
 - blue cushion
 - snow laser poles
 - thaw probe
 - Larry chair
 - skis
 - rebar protection (i should make a metal tag that says remove this protection before surveying)
 - avalanche probe
 - both light shovels
 - 2 boxes for HMP155 & foam for CNR4 & empty box for SR50A
 - hammer
 - ubolt & misc bailing wire
 - emergency pot
 - tripods for cameras