2016 Summer Nome Trip
Revision as of 12:55, 29 June 2016 by 137.229.92.213 (talk)
To Prep List:
- make HMP
To Do List:
- Existing Sites @ Kougarok
- Remove lowest section of Tower?
- Level radiometers
- level precip buckets
- general sensor refresh
- Existing Sites @ Council
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- level precip buckets
- general sensor refresh
- spend one or two nights with Mike Murphy to reduce travel times?
- radiometer setup to Grid site
- put in ground control point
New Kougarok site
- radiation
- heat flux
- put in ground control point