2016 Summer Nome Trip

From IARC 207 Wiki
Revision as of 15:18, 29 June 2016 by 137.229.92.213 (talk)
Jump to navigation Jump to search

First Trip To Do:

  • @ Teller
    • Lily / Bill -- initialize & install surface water probes (Hobo)
    • Bob Bolton -- measure discharge
    • Lily / Bill -- download data from:
      • Radiation site at top of drainage
      • snow temperature site at basin surface water gaging site
      • surface water station
  • @ Kougarok
    • if time allows, download data over radio network from Quartz Creek Air field
      • Flag 1 leave radios on full time
      • K1, K2, K3 to retrieve from.

To bring back:

  • All the old precip buckets up high in the uaf storage

To ship:

  • Hobo boxes
  • thaw probes
  • Sontek FlowTracker?


To Prep List:

  • make HMP155 cables
  • tripod


PRs:

  • batteries for small sites
  • solar panels for small sites
  • freight to Nome


TA:

  • car
  • touch base with Mike Murphy


Inventory to finish:

  • # snow sensors
  • # heat flux plates
  • # assorted brackets

Second Trip To Do List:

  • Existing Sites @ Kougarok
    • Remove lowest section of K-met Tower?
    • Level radiometers
    • level precip buckets
    • general sensor refresh
  • Existing Sites @ Council
    • Remove lowest section of Tower? @ blueberry hill
    • Level radiometers
    • level precip buckets
    • general sensor refresh
    • spend one or two nights with Mike Murphy to reduce travel times?
    • radiometer setup to Grid site
    • put in ground control point

New ~mile 60 Kougarok site

  • radiation
  • heat flux
  • put in ground control point