Super Site Tower
Revision as of 15:46, 29 August 2016 by 137.229.18.212 (talk)
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
 
Tools needed
- small wire snipper
 - flat head screw driver (medium sized)
 - cable ties
 - crimping tool
 - wire trimmer
 
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
 - something to keep an eye on. It coincided perhaps with an 8/21 visit.
 - it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 - probably need an extension to reconnect the HMP power.
 
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
 - powered off AT/RH
 - the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...