Super Site Tower
Revision as of 12:18, 28 September 2016 by 137.229.92.213 (talk)
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
- 4 x 8 x 8, 2 pcs for base
Tools needed
- small wire snipper
- flat head screw driver (medium sized)
- cable ties
- crimping tool
- wire trimmer
- measuring tape
Bolting hardware
- 9/16" Wrench & nut driver / socket
- tool belt, small
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
- something to keep an eye on. It coincided perhaps with an 8/21 visit.
- it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
- probably need an extension to reconnect the HMP power.
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
- powered off AT/RH
- the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
- 9/1
- re-routed at/rh
- hauled out bulk of tower clamps & related hardware
- 9/18-9/28
- tracking down pipe & vehicles
- fleshing out the procedure