Super Site Tower
To Purchase in town etc
- after leg supports are in place will need to pick up lag bolts for anchor base mounts
Tools needed
- Sawzall with long blade for cutting 8x8" lumber
- extra long sawzall blade
- tool belt, small
- 9/16" Wrench & nut driver / socket
- gorilla cart
Bolting hardware
- Medium-Strength Grade 5 Zinc-Plated Steel Cap Screw, 3/8"-16 Thread, 4" Long
- Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size
- Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
- something to keep an eye on. It coincided perhaps with an 8/21 visit.
- it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
- probably need an extension to reconnect the HMP power.
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
- powered off AT/RH
- the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
- 9/1
- re-routed at/rh
- hauled out bulk of tower clamps & related hardware
- 9/18-9/28
- tracking down pipe & vehicles
- fleshing out the procedure