Super Site Tower
Contents
To Purchase in town etc
- after leg supports are in place will need to pick up lag bolts for anchor base mounts
 
Tools needed Thursday
- wired Sawzall with long blade for cutting 8x8" lumber
 - extra long sawzall blade
 - tool belt, small
 - 9/16" Wrench & nut driver / socket
 - gorilla cart
 - cordless drill for hangers
 
Bolting hardware
- Medium-Strength Grade 5 Zinc-Plated Steel Cap Screw, 3/8"-16 Thread, 4" Long
 - Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size
 - Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size
 
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
 - something to keep an eye on. It coincided perhaps with an 8/21 visit.
 - it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 - probably need an extension to reconnect the HMP power.
 
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
 - powered off AT/RH
 - the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
 
 - 9/1
- re-routed at/rh
 - hauled out bulk of tower clamps & related hardware
 
 - 9/18-9/28
- tracking down pipe & vehicles
 - fleshing out the procedure