Super Site Tower
Contents
To Purchase in town etc
- possibly more 3/8" washers
 - cable ties
 - split loom
 
Extra to bring out Monday
- cordless battery charger
 - more exterior wood screws
 - proper bit for the wood screws
 
Tools needed Thursday
- Lunch
 - wired Sawzall with long blade for cutting 8x8" lumber
 - extra long sawzall blade
 - tool belt, small
 - 9/16" Wrench & nut driver / socket
 - gorilla cart
 - cordless drill for hangers
 - 2 pcs uni-strut
 - 8 pcs uni-strut clamps
 - Wood Screws & washers to secure unistrut to trailer
 - tie downs to secure pipe to trailer
 
Plan for 1st week of October
- put metal plates under the the two south side supports
 - use four of the scaffold clamps to secure each south side leg in two places to the extra scaffolding added by Ikawa.
 - once those are in place then add the remaining clamps to the south side supports.
 - with the south side complete, lock in place the weak leg support.
 - with the it in place and fully clamped, remove the original helper.
 - put in a secondary 10' support on the NW leg
 - move the fourth pipe to the NE corner
 - clamp up the NE corner leg support.
 - with the legs fully clamped, start on the guy wires.
 
Bolting hardware
- Medium-Strength Grade 5 Zinc-Plated Steel Cap Screw, 3/8"-16 Thread, 4" Long
 - Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size
 - Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size
 
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
 - something to keep an eye on. It coincided perhaps with an 8/21 visit.
 - it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 - probably need an extension to reconnect the HMP power.