2017 NGEE June Nome Trip
Revision as of 13:23, 19 May 2017 by 137.229.92.185 (talk)
- @ Kougraok M64
- if we get permission then site at the top perhaps?
- If no permission then maybe a subset of instruments adjacent to the GIPL Pilgrim site and or hold off until September / the spring.
- soil pit
- soil moisture @ 5, 10, 20, 30, 40 cm bgs
- soil thermal conductivity @ 10, 20, 30, 40 cm bgs
- soil temperature @ 10, 20, 30, 40 cm bgs
- soil heat flux near base of active layer & plant / soil boundary
- 1.5m soil temperature profile
- snow depth @ tripod
- snow depth away from tripod
- interval camera
- 4 component radiation
- Spectral response sensors: NDVI & PRI up looking and two vegetation communities
- 1.5m Air temperature, Relative Humidity, & Dew Point Temperature
- Wind speed and direction at 3m
- summer precipitation
- soil pit
- @ Teller Bottom
- send one more program to fix 5cm bgs soil moisture out of range array error
- @ C1 Grid
- We have a CNR4 for this site I believe.
- fix MRC portion of program last change we screwed something up and sent the 2011 program with a but rather than the 2012 version.
- @ C2 Blueberry
- Replace the LW Transmitted cable, will need to bring the whole package from Fairbanks
- 10meter AT/RH has not worked since 2011
- todo
- order metric handheld flow rod