Dfm2

From IARC 207 Wiki
Revision as of 10:03, 3 July 2007 by imported>Ken
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

White Hills met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed

site logs

9 June 2007, Ken I., Dan R.

  • old site dismantled for later removal:
    • battery box: about 220 pounds, including 3 batteries
    • tower/stand: about 100 pounds
    • solar panel REMOVED
  • electric fence put up using 4 posts