Activity Log

  • 8/29
    • re-routed all radiation sensors & temporary rewire
    • powered off AT/RH
    • the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
  • 9/1
    • re-routed at/rh
    • hauled out bulk of tower clamps & related hardware
  • 9/18-9/28
    • tracking down pipe & vehicles
    • fleshing out the procedure
  • 9/29
    • three of four pipes temporarily mounted
    • fourth up
  • tinkered with boardwalk