Super Site Activity Log
Revision as of 14:13, 30 September 2016 by 137.229.18.212 (talk)
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
 - powered off AT/RH
 - the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
 
 - 9/1
- re-routed at/rh
 - hauled out bulk of tower clamps & related hardware
 
 - 9/18-9/28
- tracking down pipe & vehicles
 - fleshing out the procedure
 
 - 9/29
- three of four pipes temporarily mounted
 - fourth up
 
 - tinkered with boardwalk