White Hills met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
- bring 2 posts, post driver, wire insulators; install posts midway in long runs
- secure rain gauge funnel
- flex conduit for antenna, other cables
- bring turnbuckle for N guy
13 July 2007, Ken I.
- electric fence working; taped yellow tags near posts
- fence could use two more posts in middle of long runs
- tightened both wires on NE fence run
- rain gauge funnel not secured
- tripod looks good; guys are a little slack
- site could use flex conduit on tripod wires
- radiation pole is plumb; cables a bit slack
- need turnbuckle on N guy (now secured with nylon cord)
- snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical
9 June 2007, Ken I., Dan R.
- old site dismantled for later removal:
- battery box: about 220 pounds, including 3 batteries
- tower/stand: about 100 pounds
- solar panel REMOVED
- electric fence put up using 4 posts