White Hills met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed

site logs

  • bring 2 posts, post driver, wire insulators; install posts midway in long runs
  • secure rain gauge funnel
  • flex conduit for antenna, other cables
  • bring turnbuckle for N guy


13 July 2007, Ken I.

  • electric fence working; taped yellow tags near posts
  • fence could use two more posts in middle of long runs
  • tightened both wires on NE fence run
  • rain gauge funnel not secured
  • tripod looks good; guys are a little slack
  • site could use flex conduit on tripod wires
  • radiation pole is plumb; cables a bit slack
  • need turnbuckle on N guy (now secured with nylon cord)
  • snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical

9 June 2007, Ken I., Dan R.

  • old site dismantled for later removal:
    • battery box: about 220 pounds, including 3 batteries
    • tower/stand: about 100 pounds
    • solar panel REMOVED
  • electric fence put up using 4 posts