2017 NGEE March Nome Trip
Revision as of 13:26, 17 February 2017 by 137.229.92.230 (talk)
Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.
Contents
To Do Yet
- Helicopter Safety Plan
- Renew Tracker plans for field season
- Make sure GPS systems are compatible between groups
- PR for & Ship stuff (to Nome Gnome?)
Snow Survey Gear
- 2x Thermal Conductivity Probes
- have one long sensor that still needs to be found.
- 3x Snow density tube
- 1x magnaprobe
- Lots of ziplocs
- snow scale
- short power point on snow survey techniques
- one pager for fieldbooks on what to
Cameras
- pole?
- email vicky about noodles
To Purchase yet
- ziplocs
- rebar
==
Itinerary
3/20
- Bob Busey & LANL Crew arrive in Nome
- Hotel opens @ 3pm
- pick up stuff from cargo
- gear
- safety equipment
- groceries
3/21
- Lily Cohen & Bob Bolton arrive in Nome
- Hotel opens @ 3pm
- get settled.
- get groceries
Survey marker trip day:
- 8am start
- 10am arrive on-site and set up survey gps system
- 10:45 snowmachine to the top of the drainage. Work down the hill deploying mark
- ~7 hrs to deploy markers for UAV/helo
- Stop sign
- rebar protection
- rebar
- evening: return to Nome.
3/22
- Begin snow surveys in Teller