2017 NGEE March Nome Trip
Revision as of 14:33, 2 March 2017 by 137.229.92.213 (talk)
Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.
Contents
To Do Yet
- Finalize Helicopter Safety Plan
- Make sure GPS systems are compatible between groups
- Decide if PDF Maps is worth purchasing or if an alternative is better
- 3/18/2017: Call Builders Industrial Supply to order 5/8" rebar
Helicopter Safety Gear
- Helmets Ship 3/2
- one tent in Fairbanks, one tent in Nome storage
- stove
- emergency bivys
Things to ship
- Solar Panels for radio repeater
- Sleds for hauling around watershed
- stop signs
- rebar
- large actionpacker with snow survey supplies
- snow shoes
- Most likely Bob's trip gear
- survey tripods
Aurora Vehicle Reservation
- 3/20 to 4/7 SUV
- Reservation: R40294
General Snow Survey Gear
- shovels
- 2x Thermal Conductivity Probes
- have one long sensor that still needs to be found.
- 3x Snow density tube
- 1x magnaprobe
- Lots of labeled ziplocs
- snow scale
- short power point on snow survey techniques
- one pager for fieldbooks on what to do
- I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
- small sled (can haul out by snowmachine on the 21st and leave for our use the rest of the time)
- small actionpacker
- radios so groups can maintain contact
- satellite phone
- satellite tracker
- Snow poles
- stop sign control markers
Cameras
- pole?
To Purchase yet
- ziplocs
- rebar
- deadman supplies for markers
- ground rod clamps
Itinerary
3/20
- Bob Busey (Noon) & LANL Crew (Evening) arrive in Nome
- Hotel opens @ 3pm
- pick up stuff from cargo
- gear
- safety equipment
- groceries
3/21
- Lily Cohen & Bob Bolton arrive in Nome
- Hotel opens @ 3pm
- get settled.
- get groceries
3/22
Survey marker trip day:
- 8am start
- 10am arrive on-site and set up survey gps system
- 10:45 snowmachine to the top of the drainage. Work down the hill deploying markers
- ~7 hrs to deploy markers for UAV/helo
- Stop sign
- rebar protection
- rebar
- evening: return to Nome.
- Snow Poles
3/23
- Begin snow surveys in Teller
- Proceed from site to site
Random
- Radio test in Council
- Move base station in Nome
- download station data at three loggers in Teller
- End of trip need to deploy Pressure Transducer that is in Nome Storage
- Need to program Teller_SW site to send satellite data
- Need to program Teller_Bottom site to send satellite data