Barrow Summer 2017 trip

From IARC 207 Wiki
Revision as of 15:51, 4 August 2017 by 137.229.92.185 (talk)
Jump to navigation Jump to search

ARM

  • replace SR50a snow transducers
  • snip veg if necessary
  • install CFM
  • what is the deal with the LPM power connector? do I need a new one?
  • install cs107 => PROGRAM CHANGE
    • cable housing
  • mount LPM
    • baird mount
    • pipe
    • trail mat
    • cable for power and coms
    • cable housing
    • rebars for base
    • two pieces of unistrut
    • ubolts

to purchase:


to bring

  • sledge hammer (and maybe drill?)
  • fish tape
  • proof of driving insurrance (reservation number 7127)
  • computer and charger!
  • tool bag
  • anti corrosion goo

for fence install

  • pipe pounder
  • ladder
  • screed stakes
  • small bolts and nuts
  • drill, metal bits, permafrost bits
  • clamp to drill through pipe


NGEE

  • desiccant for cnr4
  • level cnr4
  • level tipping buckets
  • sr50a transducers