2017 NGEE Nome October trip
Revision as of 13:31, 13 September 2017 by 137.229.92.213 (talk)
Activities:
- teller top:
- double-check data
- thermal conductivity probes working?
- maybe replace cnr4
- and or drill out stripped screws
- teller bottom
- sr50a transducer replacement, 2x
- remove 1 PT
- discharge measurement
- Kougarok m64
- bring guy wire markers for K64 met station (at uaf storage)
Loose Itinerary
- 9/29 (8:18 - 9:36 Twilight to twilight)
- evening: arrive & stay in apartments
- 9/30 (8:21 - 9:19)
- take some storage stuff to dump
- evening: Lily arrives
- stay in hotel
- 10/1 (8:24 - 9:16)
- Teller
- walk the end point of the lines set up in March 2017 and remove the orange poles
- place 4 poles at bottom to help outline location of channel for PTs
- 10/2 (8:27 - 9:12)
- Teller button up for winter, snow pole remainder
- remove one PT at the bottom site
- 10/3 (8:30 - 9:09)
- drive to kougarok. download data over radios from K sites
- stretch goal... visit k2 if time for thaw depth measurements
- 10/4 (8:33 - 9:05)
- kougarok m64 winter button up
- ??? soil pit ???
- kougarok m64 finish surveying & deploy snow poles
- 10/5 (8:36 - 9:02)
- Council
- survey 2017 plots?
- download data
- visit C2?
- 10/6 depart