Dbm8

From IARC 207 Wiki
Revision as of 21:11, 10 July 2007 by imported>Ken
Jump to navigation Jump to search

Bullen Point met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • TAKE SR50 cable to site, estimated 40-feet (but check design specs!)
  • return/replace site logbook to enclosure

site logs

14 June 2007, Ken I., Doug K.

  • net radiometer replaced
    • s/n 052046
    • 14.6 uV/W-m^2
    • 120 cm centerline sensor to ground
  • SR50 -- cable missing, not replaced (had one, but too short)
  • RMYoung & HMP45C cables put in flex conduit on tripod
  • no GWS-YSI sensor, and no conduit was left for it
  • AT shields braced with mast/enclosure bracket to strengthen
  • antenna cable wrapped with nylon spiral wrap; no way to pull into conduit
  • conduits wired (using tie-wire) to enclosure entry fittings to secure
  • soil temp profile cable: added strain relief using hose clamp & cord; load was on the multiplexer terminals
  • added cord inside enclosure to secure extra/loose cables inside
  • replaced rain gauge
    • model: TR-525USW
    • s/n: 37655-1205
    • collector/funnel secured with hose clamp
    • screen secured with electrical tape


13 June 2007, Ken I., Doug K.

  • installed electric fence with 3 posts
  • no time to fix site cables
  • LOTS of fox scat around site, many chewed cables
  • accidentally removed site logbook