SS Site Visit 2018-03-22

From IARC 207 Wiki
Revision as of 14:46, 22 March 2018 by 137.229.18.212 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Clear snow off shed roof
  • setup dropbox file transfer for forest floor
  • confirmed file transfer for tower laptop
  • cleared snow off tower
  • secured tower LI7200RS on tower (had loosened)
  • confirmed both flow modules say 15.0 measured flow
  • SW update on old ss_main toughbook
  • Looks like anemometer info was lost in SW/HW upgrade. Will need to sort that out.
  • Not sure why the Tower Dewpoint and H2O concentrations are negative.
  • Bringing back gill manual to look into it further.
  • Should download digital configuration from LICOR website for each unit.