SS To Do Next Visit

From IARC 207 Wiki
Revision as of 09:10, 18 May 2018 by 66.58.227.216 (talk)
Jump to navigation Jump to search

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • replace Loggernet computer
  • The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations:
    • LI7200RS
  • Upgrade the smart flux 2 firmware on the tower