SS To Do Next Visit

From IARC 207 Wiki
Revision as of 09:40, 10 July 2018 by 24.237.87.170 (talk)
Jump to navigation Jump to search

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • Tower Top CNR4 longwave thermistor wasn't fixed on last visit after all...
  • replace Loggernet computer
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations: