SS To Do Next Visit

From IARC 207 Wiki
Revision as of 10:43, 10 July 2018 by 137.229.92.213 (talk)
Jump to navigation Jump to search

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • Tower Top CNR4 longwave thermistor wasn't fixed on last visit after all...
'' CNR4 Tower Top
'' CNR4 Left Yellow cable (Red-White Tape)
'' CNR4 Right Yellow cable (Red-Black Tape)
'' Thermistor Hi (White Wire) -- CR1000 SE8
'' Thermistor Lo (Black Wire) -- CR1000 AG
'' Precision Resistor -- CR1000 SE8 to CR1000 VX1
'' Shield -- CR1000 Ground
  • replace Loggernet computer
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations: