SS To Do Next Visit
Publications List
2019
- Site power seems maybe off... just wifi maybe.
 - try upgrading
 - mount Arable to tower?
 - program time for new soil pit...
- bring out survey tripod to secure instrument box to.
 - write program of course...
 - bring out MD485 to tie in to network out there.
 
 
May 2019
- finish pit
 - recalibrate LI7200s
 - mount Arable
 
2018
Fall List
- Photograph tag & equipment for:
- LICOR units (tower & forest)
- Property Tag 36113 (I think this may be Y Kim)
 - Property Tag 36114 (I think this may be Y Kim)
 
 - 3 CR1000s
- Property Tag 36104
 - Property Tag 36106
 - Property Tag 36117
 
 
 - LICOR units (tower & forest)
 - Might add a SR50A to the soil pit
 - might add a SI111 to the soil pit
 - might add a UPS for the heat flux logger system in case there are power problems
- the network switch connecting the toughbook to the LI7200 and the LI7200 to the fluxprocessor
 
 - Need to find out OS version of tower wind master pro
 - need to remove battery from sky cam laptop
 - bring out NL100/200.
 - error message associated with heat flux memory card... replace memory card.
 - order a LiCor network cable for forest floor.
 
Summer List
- More PAR sensors and hardware for in-situ
 - Polish Battery Backup System
 - replace Loggernet computer
- bring out an NL100 or USB to serial adapter
 
 - Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
 - MetOne 010C
 - Kipp & Zonen CNR4
 
 - Late Fall recalibrations:
- LI-7200s
 
 
Ss soil has room on c5 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
- C5 -- SDI12 ID 8 = Shed
 - C7 -- SDI12 ID 9 = Forest Floor Radiation Stand
 
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
- Replace SR50A transducers
 - Dig second pit for soil instruments
 - clean up outdoor power cords
 - waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
 - I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
 - connect those shop power strips and get one more for inside?
 - buy and add more PAR top and bottom (4x and matching hardware)
 - add another tipping bucket.
 - bring solder out for ff atrh blower and electrical goo