NGEE Teller Top Notes

From IARC 207 Wiki
Revision as of 18:02, 14 May 2018 by 66.58.227.216 (talk) (Created page with "* Partway through processing soil. ===Met 2017=== * HMP155 August 2017 ** failure looks legit... not a data gap. * HMP155 Cuts out on 10/25 8:00 ** replaced AT portion with ne...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Partway through processing soil.

Met 2017

  • HMP155 August 2017
    • failure looks legit... not a data gap.
  • HMP155 Cuts out on 10/25 8:00
    • replaced AT portion with new AT thermistor.
    • DP & RH left NAN
  • HMP155 replaced on March 2018 visit
  • Rain corrected through most recent download.
  • Wind Speed / Direction
    • Propeller replaced 6/28/2017
    • No Rime fall 2017

Met 2018

  • Wind
    • all rime conditions corrected for through 3/2018 in QC spreadsheet.
  • Rain NAN through March visit.

Radiation 2017

  • There is a gap 10/2/2017 0:00 to 10/2/2017 22:00
    • I think this is when we removed the sensor from the field to change the desiccant.

Radiation 2018

  • All good through March visit.

Soil 2017

  • 2017-03-12 02:00:00 Upper heat flux plate has a value that isn't ever flipped by the qc program. So just a note that need to remove it manually.

Snow 2018

  • Snow temperature profile
    • Weird shift (looks like mux wonky 1/22 to 1/28/2018)