2018 NGEE Fall Utqiagvik Trip

From IARC 207 Wiki
Revision as of 14:03, 29 September 2018 by 137.229.112.93 (talk)
Jump to navigation Jump to search

Fairbanks todo

  • pull out necessary tools
  • pack gear
  • pack daypack
  • charge drill
  • assemble food & drink

Important Times

  • Flight: Alaska 192 Departs: Fairbanks (FAI) on Mon, Oct 1 at 11:00 am
  • Sunrise: Oct 2 at 8:50 AM
  • Flight: Alaska 50 Departs: Barrow (BRW) on Tue, Oct 2 at 7:09 pm

Utq To Do

General

  • Bring electrical tape to re-cover HMP155 sensor ends for moisture protection
  • Bring grease / anti corrosion compound for electrical connections
  • Bring SR50A transducers
  • Bring Net Radiometer Desiccant

Site A

  • Replace 2x SR50A transducers
  • Replace HMP155 failed (3.5m)
  • Replace tip on HMP155 (1.4m)
  • Level Tipping Bucket
  • Level Radiometer
  • Change Radiometer Desiccant
  • Polish Radiometer domes

Site B

  • Replace 2x SR50A transducers
  • Intensive Site B HMP155 failed (1.4m)
  • Level Tipping Bucket
  • Level Radiometer
  • Change Radiometer Desiccant
  • Polish Radiometer domes

Site C

  • Replace 3x SR50A transducers
  • Intensive Site C HMP155 failed
  • Level Tipping Bucket
  • Level Radiometer
  • Change Radiometer Desiccant
  • Polish Radiometer domes
  • Check connection to soil moisture grid logger MD485 relay
  • Move antenna outside of box and if needed, use fish tape for this step
    • have also included some extra duct seal if needed for re-sealing of box

Site D

  • Replace 1x SR50A transducers
  • Replace tip on HMP155 (1.4m)
  • Level Radiometer
  • Change Radiometer Desiccant
  • Polish Radiometer domes

BEO Control Shed

  • need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping...
    • I think I almost need to connect the computer to a screen to see where the hang up is if it indeed turned on so I'll bring my light keyboard/mouse and an HDMI to DVI cord.
  • label the computer
  • bring up the nuc plate and wood screws and other screw packet to mount nuc to wall
  • troubleshoot the network connection in control shed.
  • take new pictures of inside control shed

To Bring

  • Tools
    • CSI Phillips for opening CNR4 radiometers and SR50A
    • Tap & Die in case any more radiometer screws strip
    • torpedo level for tipping bucket level
    • 5/16" screw driver for tipping bucket level
    • electrical tape for HMP155 replacement
    • Antenna & coax for C site to get antenna outside of the box. (two different antennas will decide on which up in Utqiagvik)
    • Drill & battery for potential tap & die stuff


On Site

  • Should be a ladder at the NGEE Flux tower for use replacing 3.5m instruments