NGEE Teller SW Notes

From IARC 207 Wiki
Revision as of 15:32, 21 June 2018 by 24.237.158.11 (talk) (Created page with "===Latest=== * Officially processed through 10/2017 * Partway through processing to 6/15. * hoping to establish stage/discharge curve in 2018 ===Stage 2016=== ===Stage 2017=...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Latest

  • Officially processed through 10/2017
  • Partway through processing to 6/15.
  • hoping to establish stage/discharge curve in 2018

Stage 2016

Stage 2017

Stage 2018

=Site Downloads / visits:

  • Bob 4/21/2016 (CR1000)
  • Lily 7/13/2016 (CR1000)
  • Bob/Lily 8/12/2016 (CR1000)
  • Bob 9/14/2016
  • Bob 4/1/2017
  • Bob 5/2017
  • Bob/Lily 10/1/2017
  • Bob 3/30/2018
  • Bob 6/13 & 15/2018