SS Site Visit 2018-07-21

From IARC 207 Wiki
Revision as of 12:31, 21 July 2018 by 137.229.21.10 (talk)
Jump to navigation Jump to search
  • brought out Ameriflux team
  • Fixed CNR4 top thermistor which I think the connector was cross threaded a bit and as tight as it would go but not actually engaged. Or previously engaged and loosened shortly after the reinstallation.
  • brought out replacement computer for met data but thinking I won't install until after the experiment is over and power needs are less... or I'll see once everything is all set and then maybe add.
  • Extension cord for forest floor tower had fallen out of the wall a bit... plugged it back in.
  • still doing a bit of boardwalk work

For to do next visit

  • could use several power strips in shed to make sure circuits are more easily balanced.
  • Should use those one hole deals plus drill and screws to take a bit of pressure off the extension cords plugged in but hanging outside shed.
  • need to bring out red & black wire for the 12v power supplies for the two laptops.
  • shift data logger power onto the 12v battery system
  • buy more cross arm brackets for additional PAR sensors on top
  • bring out new skin surface temperature sensors
  • bring out charged dewalt battery for sawzall.
  • circuits are a bit unbalanced at the moment
  • check with Bob about billing.