2018 NGEE Nome September Trip
Contents
Post Trip Notes and such
- could bring ubolts up to teller top to better level the precip bucket / hose clamps
 - swapped out desiccant at teller bottom net radiometer and also teller sw
 - made a discharge measurement, 2x at the sw site.
 - leveled all radiometers
- at ngee-koug site need to check compass direction every trip.
 - ngee-koug precip wasn't quite level after another musk ox hit.
- bring up tools and rethink again for march trip.
 
 
 - teller cas site
- need guy wires for geonor and solar panel
 - think about getting panel higher and or
 - need proper ring terminals for the battery(s)
 - need to think about rewiring at/rh sensor to turn on/off rather than be on all the time(but need to review the program to confirm)
 - Still need to fix helicopter headsets
 - Need guy wires for the geonor gages
- and anchors
 
 
 
Surveying NGEE-Koug
- Bumper to Control: 42"
 
NGEE Koug Notes
- Wind Sensors east/west @ 58* magnetic
 
K2 Met Notes
- Required Tools:
- Phillips CSI for snow depth
 - Torpedo Level & 5/16" nut driver for precip
 
 - There is extra wire rope for net radiation stand but need more thimbles
- thimble size requires 7/16" wrench.
 
 - Bring desiccant for radiometers next visit
 
K3 Mauze Notes
- Able to connect to radio but unable to wake logger
 - replace CSIO/RS232 box?
 
K1 Burn Notes
- able to download data by radio and data looks great
 
Kigluaiks Notes
- Able to connect to radio but unable to wake logger
 
Surveying at Teller
- 30.25" above CP02 rebar to bumper
 
Teller Stage
- 2018-09-24 18:50 AKDT
- 3cm above rebar 1
 - 13cm in front of rebar 1
 
 - 2018-09-26 10:48 AKDT
- 5cm above rebar 1
 - 14.5 cm in front of rebar 1
 - Salt in Solution Dilution #1 == 50.21g / LANL Bag #19
 - Salt in Solution Dilution #2 == 50.12g / LANL Bag #15
 
 
Teller Bottom Notes
- VATP at bottom no frost jacking
 - swapped out VATP snow sensor
 - still need to tap & die a new hole for the last screw.
 
Council
- Need to replace antenna coax at council grid and move antenna (animal nips).... might also take opportunity to move radio to other box and pull the army box?
- ... this would require bringing out a spare of the waterproof radio cables with db9 on the end.
 
 - I think antenna move could be flip snow arm and use old sr50 stub for the vertical deal. Also might just change our antenna...
 - Unable to download data but moved antenna and also turned radio on.... this got the site back on the radio network...
 
Council Surveying
- GPS at cp01, 49.875" (7/8") bumper to rebar
 
To Ship
- bring out non spillable paperwork too for return.
 
To Take Bolton
- Trimble Pelican case (no lithium batteries are in the case)
 - nrs straps
 - soil sample volume
 - sat phone
 - tracker
 - lg actionpacker filled with these items (not yet designated)
 - conductivity meter for discharge measurement
 - sample bottle for discharge measurement
 - 100g salt ziplocs
 - SC32B f
 - volt meter
 - Tap & Die
 - desiccant for teller bottom
 - SR50A transducers once they arrive
 - a ziploc labeled Nome
 
To Take Busey
- All necessary lithium batteries
 - toughbook
 - snacks
 - new fieldbook
 
To Do Yet
- GeoPDFs with new points
 - Load XML into trimble software and copy over to handheld controller
 - step stool for teller bottom
 - short as possible 4/40 screw
 - Safety Document
 - pick up toughbook charger on way south
 - take desiccant out of crockpot and pack for trip
 
Bob Busey
Favors
- Ask Stan to borrow a drill again
 
Activities
Support Chinese Delegation
- September 18: Arrive in Nome
- 9/19 Meet Bob Metcalf
 - 9/19 - 9/25: Final Site Selection & Install ground instruments
 - 9/20-25: Get permits & install sites
 
 - September 26 Evening: Leave for Fairbanks
 
Sunrise / Sunset
- 9/20 : 8:39 & 9:09PM
 - 9/21 : 8:42 & 9:04 PM
 - 9/22 : 8:45 & 9:01 PM
 - 9/23 : 8:48 & 8:57 PM
 - 9/24 : 8:51 & 8:54 PM
 - 9/25 : 8:54 & 8:50 PM
 - 9/26 : 8:57 & 8:46 PM
 
Teller
- Check the next visit page (I'll copy/paste at some point)
 - If time allows, Amy Breen has some surveying to be done. And, if we're able to survey then they'd also like thaw depths at their plots.
 
Teller Bottom
- change transducers for snow depth sensors
 - download data
 - measure VATP thermistors
 - relevel radiometer
 - bring out one step stool to level teller bottom radiometer. / another tall person.
 - tap new hole in CNR4 & replace desiccant
 - bring desiccant for box
 
Teller Surface Water
- download data
 - replace desiccant
 - discharge measurement with salt slug
 - Need to secure solar panel before winter with nails
 - YSI conductivity meter
 
Teller Top
- download data
 - change transducers for snow depth sensors
 - relevel radiometer
 
Council
- If time allows Amy Breen has some plots that need surveying and thaw depths
 
Council C1 Grid
- Would be great to visit C1 site and download data
 - Redrill hole for C1 Grid temperature probe
 - sr50a swap out?
 - relevel precip bucket
 
Skookum Pass
- swap out data logger
 - change program to add radio on/off
 - current site photo
 
C2 Blueberry
- Download Data
 
Kougarok
Kougarok Mile 64
- Download Data
 - don't really need snow depth here it would seem but just double check all measurements and relevel radiometer / precip
 - Amy Breen has a number of points to be surveyed here. She'd like thaw depths for all we're able to visit.
 
Kougarok 10m tower
- A station visit to would be awesome even for just 2 hours to double-check site in anticipation of it being used for the disturbance study.
 - Mandatory download data though even if by radio
- If we visit I'll put a storage module back at the site so it's less pressing.
 
 - level precip bucket
 - level radiometers
 - replace radiometer desiccant
 
Kougarok Mauze gulch
- Minimum would be download data by radio
 
Kougarok Burn Site
- Download data by radio