SS Site Visit 2018-12

From IARC 207 Wiki
Revision as of 10:38, 8 February 2019 by imported>Bob (Created page with "* Wiped snow off all sensors * replaced 9m atrh ** 11m ATRH not functioning. * connected forest floor smartflux2 directly to 7550 * grabbed backup computer and labelmaker * ve...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Wiped snow off all sensors
  • replaced 9m atrh
    • 11m ATRH not functioning.
  • connected forest floor smartflux2 directly to 7550
  • grabbed backup computer and labelmaker
  • verified connections with toughbooks
  • pulled cF card at heatflux site

To do:

  • put out cr1000 and md485 for smartflux 2 data
    • bring a CR800 to test in Anchorage.
  • find an rj45 ethernet coupler for forest floor to computer connection... I think? might check old pictures
  • find CF cards for heat flux site