SS Site Visit 201-05-17 to 27
Fixes
- Replace power cable connector for aspirators (animal chew)
- replace LI7550 at forest floor
- swap out tower top CNR4
- computer maintenance on PEN Camera
- computer maintenance on ss-lognet
- add arable
- add soil pit 2
- check the precip bucket... still good
- program mod for ss_met and ss_soil to output arable variables on the five minutes
- program and wire up soil pit box
- retire old ss-main toughbook
- reconnect tower LICOR to toughbook.
- download data
Left at site:
- soldering iron
- propane torch to start soldering iron
- solder
Ziploc toolsack
- 5/16" Nut Driver
- 7/16" Nut Driver
- 1/2" Nut Driver
- Small Campbell Phillips Screwdriver
- Small Campbell Flat Screwdriver
- Large Campbell Flat Screwdriver
- 1/2" Wrench
- Large Phillips Screwdriver
- English Allen Wrenches
To Do Yet
- solder HMPcable
- figure out if smartflux2 at forest floor is properly configured.