SS Site Visit 2021-10
Sensor Photo procedure
For recalibration swaps.
- Picture 1 = The new sensor being deployed
 - Picture 2 = The old sensor being removed to send away for recalibration.
 
Partial Task List
- Ground anchor strengthening
 - finish tracking power
 - Snow Transducer Swap
 - Replace CNR4s
 - replace the anemometers starting from top
 - XX pull out the eddy covariance units for recalibration
 - XX replace geonor antifreeze
- I have written on the a bucket the ratio. Also need to dilute the mix so I can drop at dump.
 
 - Hang the SWE sensor
 - Add the NL100 to the network
 - update the software
 - 12V battery backups
 - replace UPS batteries?
 - Check output current of the two solar panels out there
 
Activities
- 2021-10-06 12:00 AK DT -- changed liquids in the geonor.  8 liters 60/40 mix & 1 bottle baby oil
- Removed like 5.3 gallons
- (Which means that last year's mix amount for antifreeze was more than necessary). 5.3 gallons removed = Freezing point of bucket around -25C
 
 - 8 liters mix = 72.7 cm liquid with freezing point @ -40
- Realistically we only need the 60/40 mix to go to -40 by around April 1 so 72.7cm is extreme overkill and maybe I'll reduce the volumes down the road.
 
 - Re leveled stand, too.
 
 - Removed like 5.3 gallons
 - Plugged in tipping bucket heater
 - Remove Forest Floor LI7200
 - Swap Tower LI7200 (But need to update the calibration info still)
 - Add an HDMI switch for monitor.
 - Swap out top 2 anemometers