SS To Do Next Visit
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
Contents
Sensor Review Page
Calibrations Swaps 2021
- Forest Floor RS485 HMP155:
- 7/29/21 Removed P3520500
 - Replaced with G4940001
 
 
Publications List
Sensor Refresh Budget
2022
- Need to buy three more CS650s for fall soil pit.
 - 12v batteries
 - POE to 12V battery hardware
 
2021
- Check clocks
 - Bring out a gender changer for null modem plus a serial cable or two.
 - Turn MD485 & NL201 for original data loggers into a NL100 w/ RS485 output.
 - Presentation outlining all Electrical plug ins and what is plugged into them.
 - XX Updated the network so it will work all of the time with or without LAN.
 - Need to update Licor Software
- Update the windows, too?
 
 - Identify power needs
- Submitted a PR for the power monitor.
 
 - Map out all network devices
- Shoud grab pictures too.
 
 - Found alternate location near gate for SWE sensor.
 - Update Kathe on what is out here including estimated costs
 - Bring an HDMI splitter so both laptops can share the screen.
 - XX bring out the third small router so that the networking is more resilient.
 - build a tripod for the cameras?
 - Pick up all thread stock that will fit inside the large thimbles I have.
 - XX 6/3 Tower Top Radiometer bracket needs two more screws... old ones sheared off.
 - need to bring out a 1/2 inch nut for one anchor. 5/16" diameter... For North side
 - XX Location for SWE sensor
- 6/3/2021: Snow pillow spot has 4-5m diameter space.
 
 - XX Make sure we can make the two tripods.
- XX Yes
 
 - Check 6m  AT/RH wiring.
- I think we replaced it in March 2021 but it is still acting up so likely to be a cabling issue again.
 - have a cable just need to solder into a single piece. (where did this cable go...)
 
 - Send away anemometers
 - send away HMP155s
 - check calibration budget
 - XX try to buy CFM100s for soil and met loggers
 - XX Redo the forests floor AT/RH bracket.
 - complete inventory of gear in the office
 - XX copy down again the pakbus IDs to the wiki here...
 
Program Change
- XX change ss_soil soil moisture to period averaging method to reduce overranging
 - XX add leaf wetness sensor to geonor again?
 - XX change sdi12 instruction for ss_ff_rad snow to output quality number... looks to be zero.
 - Check ss_soil_2 datapro config for soil temp 4 which shows good data while connected to station but nan on webpage.
 
May 2021 Datapro remainder Items
- ss_geonor -- need to add charger key file etc
 - ss_soil_2 -- need to add sm_profile.dat and snow.dat to automated processing.
 - ss_ff_rad -- need to add snow to automated processing.
 
To Purchase
- For SWE tripods:
- 1 Inch Schedule 40 pipe, 10ft, 6pcs (leg / leg brace)
 - 1.5 inch schedule 40 pipe, 10 ft, 2 pcs (mast)
 - phenocam parts... 2" pvc maybe plus rubber gasket and what else?
 
 
2019
- bring out MD485 to tie in to network out there
 
May 2019
- check sr50a #2 maybe not working according to data.
 
2018
Fall List
- Photograph tag & equipment for:
- LICOR units (tower & forest)
- Property Tag 36113 (I think this may be Y Kim)
 - Property Tag 36114 (I think this may be Y Kim)
 
 - 3 CR1000s
- Property Tag 36104
 - Property Tag 36106
 - Property Tag 36117
 
 
 - LICOR units (tower & forest)
 - Might add a SR50A to the soil pit
 - might add a SI111 to the soil pit
 - might add a UPS for the heat flux logger system in case there are power problems
- the network switch connecting the toughbook to the LI7200 and the LI7200 to the fluxprocessor
 
 - Need to find out OS version of tower wind master pro
 - need to remove battery from sky cam laptop
 - bring out NL100/200.
 - error message associated with heat flux memory card... replace memory card.
 - order a LiCor network cable for forest floor.
 
Summer List
- More PAR sensors and hardware for in-situ
 - Polish Battery Backup System
 - replace Loggernet computer
- bring out an NL100 or USB to serial adapter
 
 - Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
 - MetOne 010C
 - Kipp & Zonen CNR4
 
 - Late Fall recalibrations:
- LI-7200s
 
 
Ss soil has room on c5 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
- C5 -- SDI12 ID 8 = Shed
 - C7 -- SDI12 ID 9 = Forest Floor Radiation Stand
 
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
- Replace SR50A transducers
 - Dig second pit for soil instruments
 - clean up outdoor power cords
 - waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
 - I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
 - connect those shop power strips and get one more for inside?
 - buy and add more PAR top and bottom (4x and matching hardware)
 - add another tipping bucket.
 - bring solder out for ff atrh blower and electrical goo