2022 NGEE Nome August Trip
Contents
Recap
K1 Burn
- Both AT/RH dead again
- WS/WD still functioning
K2 Met
- Precip bucket still level from last year
- Everything else remaining looks to be working (of met instruments)
- Oh, 1m WS bearings render it nonfunctional.
- Leveled radiometers but did it without needing to adjust the tower.
- Changed desiccant
- old sr50A still good
- Might be some significant clock drift.
K3 Mauze Gulch
- AT/RH still working
- Snow depth still working
NGEE m64 met
- Replace AT/RH
- Replace SR50A
- Replace Barometric Pressure & secure vent tube
NGEE m64 IS5 snow site
- Need to bring out a bit more 3/16" wire rope and an anchor
- and sledge...
NGEE m64 trans9 snow site
- All good at this one.
Teller SW
- Could use one more serial cable here.
- Still need to change out desiccant
- Discharge reading (tentatively looked good for lower flow)
Teller Bottom
- Lower SW radiation is intermittently erorring. Bring out a replacement cable.
- Precip bucket was knocked by moose again but only slightly off level.
- Still need to do program change.
Teller IS2 Snow
- Station had tipped over.
- Still need to replace the 10ft top pole
- Need 3/16" wire rope here, too.
- Need screed stake and another anchor to prevent another tip
- The data logger got soaked over summer and will need replacement
- The charge controller still needs replacement (still need to grab from Fairbanks)
Nome NW Campus Base station
- Checked on base. Radio antenna and coax outside the building still looks good
- Conex still not moved.
Left in storage for next trip
- 2 AT/RH cables for Teller Top
- 1 pressure sensor for ngee m64 met
- A bunch of cable protection for the snow sites
- fresh desiccant for teller sw
- sr50a transducers
- 16pcs 3/16" cable clamps
- 3 (I think) AT/RH sensors
- 1 SR50A for teller 47.
At Storage
- Pepper Spray
- Tent
- Radio setup
- Discharge gear
- Look for tipping bucket replacement for Teller Bottom
Activities
- Download Kougarok end of road sites by radio / visit.
- Support Go with thaw depths and GPS survey
Teller 27 Site
- Discharge measurement @ Teller m27 creek
- Inspect the sites here for how to fix animal damage
- Teller IS2
- Teller Bottom
Kougarok Met
- Replace desiccant in Radiometers
- Torpedo Level
- CSI phillips screwdriver
- multitool
- stubby phillips screwdriver
- 5/16" and 1/4" nut drivers & wrenches (
- Guy wire tighten
- 5/16" nut driver I think
- Level Precip
- Torpedo level
- Download Data
- Sc32B and serial cable
- bring spare CR10X in case there are more hardware problems
To Ship
- Desiccant
- SR50A transducers?
- Spare CR10Xs