2007 September Nome Trip

From IARC 207 Wiki
Revision as of 12:46, 31 August 2007 by 137.229.92.253 (talk)
Jump to navigation Jump to search

Overview

Here's what I see for the final Nome trip activities (suggested dates 9/13 - 9/17):

  • Install snow depth sensors
  • pull net radiometers
  • pick up atv from morgans
  • Survey the Niagra gulch
  • council thaw grid
  • kougarok thaw grid
  • pull Niagara & Kuzitrin stations completely
  • Visit Skookum / Look for animal chews on the blueberry site radio cables (to improve communication to the council sites).
  • gage Kuzitrin & Snake rivers

NWS Snake River gage

Itinerary

Breaking down into days and a proposed itinerary for Nome:

9/13 Thursday

  • Fly out in the PM for Nome on Ak Air
  • Stay at hotel

9/14 Friday

  • Pick up ATV @ Morgan's (hours 9-6)
  • Council Thaw grid
  • Winterize Council stations
    • Pull Net Radiometers
    • Install a snow sensor @ C2 blueberry
    • Replace snow sensor @ C1 Grid
    • Replace precip bucket @ C2
    • Replace Radio cable @ C2...
  • If radio cable at K2 isn't damaged then visit Skookum to look for damage up there
  • Stay at hotel in Nome

9/15 Saturday

  • Get some groceries (although we still have a lot of food out there so it won't need to be much)
  • Gage Snake
  • Kuzitrin Site
    • Gage w/ Rivercat
    • Pull the site
  • Visit K2 10m met
    • Pull Net Radiometer
    • Replace Snow sensor
  • Niagara Creek
    • Survey gully & do thaw depths
    • Gage creek one last time
    • Pull station
  • Stay at Cabin in Kougarok

9/16 Sunday

  • Kougarok thaw grid
  • Visit K1 Burn
    • Add snow sensor
    • Pull Net Radiometer
  • Visit K3 Mauze Gulch
    • Replace snow sensor
    • Pull Net Radiometer
  • Inventory Nome Storage
  • Stay at hotel in Nome

9/17 Monday

  • Air Cargo some stuff back to Fairbanks (To yet be determined)
  • Fly back to Fairbanks on Ak Air (In two groups perhaps?)