Upper Kadleroshikik River DBM5 met site
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
28 Aug 2007, Ken I., Rob G.
Visited site after it had been AWOL from the radio network. Found bear damage to external wires/cables and solar panel. Repairs needed for:
- RM Young cable
- radio antenna cable
- HMP45C sensor and cable
- YSIx3 -- may be ok?
- soil sensors: all wires pulled from logger
- solar panel needs replaced
- SR50 wire pulled from logger
- net radiometer wire pulled from logger
No detailed notes on work accomplished, but most of the above was done.
29 Aug 2007, Ken I.
Installed 50W solar panel.
YSIx3 AT sensor all bad; replaced with GWS-YSIx1, Therm-YSI1-07116