June 2008 Field Trip - Emily and Ken
Revision as of 10:59, 5 June 2008 by imported>Eyoucha
1. DFM2 Bear Damage: Need anemometer cable, solar panel, soil profile (?), electric fencing checked, Measure distance from ground to snow sensor
2. DBR4 Troubleshoot: Lost communications with site
3. DBM7 Snow Sensor: Needs SR50 replacement. Measure distance from ground to snow sensor.
4. DBM5: Check wiring of soil sensors, take photo. Measure distance from ground to snow sensor.
5. DBM6: Check soil temperature, Measure distance from ground to snow sensor.
6. DFM4: Measure distance from ground to snow sensor
Ken add stations that need conduit and bear fencing.