June 2008 Field Trip - Emily and Ken
1. DFM2 Bear Damage: Need anemometer cable, solar panel, soil profile (?), electric fencing checked, Measure distance from ground to snow sensor
2. DBR4 Troubleshoot: Lost communications with site
3. DBM7 Snow Sensor: Needs SR50 replacement. Measure distance from ground to snow sensor.
4. DBM5: Check wiring of soil sensors, take photo. Measure distance from ground to snow sensor.
5. DBM6: Check soil temperature, Measure distance from ground to snow sensor, reset antennae radio guy wires.
6. DFM4: Measure distance from ground to snow sensor
7. DBM3: North fence needs another post, solar panel wires are exposed, needs "plates" or other protection
All sites need HMP45C replacement and send back old for recalibration.
Ken add stations that need conduit and bear fencing.