1. DFM2 Bear Damage: Need anemometer cable, solar panel, soil profile (?), electric fencing checked, Measure distance from ground to snow sensor
2. DBR4 Troubleshoot: Lost communications with site
3. DBM7 Snow Sensor: Needs SR50 replacement. Measure distance from ground to snow sensor.
4. DBM5: Check wiring of soil sensors, take photo. Measure distance from ground to snow sensor.
5. DBM6: Check soil temperature, Measure distance from ground to snow sensor, reset antennae radio guy wires.
6. DFM4: Measure distance from ground to snow sensor
7. DBM3: North fence needs another post, solar panel wires are exposed, needs "plates" or other protection
- All sites need HMP45C replacement and send back old for recalibration.
- Ken add stations that need conduit and bear fencing.