2021 NGEE Nome August Trip
Jump to navigation
Jump to search
NGEE Project Disturbance / Kougarok focus. Helping Go mostly.
- Tentatively plan to visit all three Kougarok met stations...if time
- Replace desiccant @ 10m tower
- Replace CR10X @ 10m tower
- Replace CR10X @ Mauze Gulch site
- Replace snow transducers
- Measure ground control at NGEE Koguarok mile 64 site (drop off GPS and pick up the next day)
- Thaw depth and subsidence survey
- Measure creek flow at Teller mile 27 site
(Most of this trip itinerary is being driven by subsidence survey and drone work)
August 27
- Fly into Nome in afternoon
- rent truck and visit conex
- Charge 12v batteries and yellow trimble batteries
August 28
- Drive out to Kougarok and hope to stay in the airport cabin out there.
- Full day of measurements.
- setup Trimble station @ end of road for surveying
August 29
- Full day at the site and then return in evening to Nome
August 30
- On drive back to Kougarok deploy the base GPS at NGEE m64 GCP.
- Full day at the site
- camp in cabin again.
August 31
- Partial day at site
- Retrieve survey gps @ m64 site on drive back to Nome
- pack up
September 1
- Ship gear that needs to be sent out out.
- hop on airplane and return to Anchorage / Fairbanks