SS Feb 2011 Trip 1
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
On site todo:
- Software updates
 - wifi check
- Replace Antenna
- drill out holes if needed to support the 1/4" hardware
 - Mount Vertically (Horn points up)
 - Aim new Antenna
 - seal coax again
 - cut off the old tapes
 
 
 - Replace Antenna
 - Maybe reduce insulation in tower box
 - use loggernet remote to add diagnostics logger to schedule
 - setup keys with www3
- download IPs
 - upload data
 
 - load temperature monitoring python program onto the toughbook with the seconds fix
 - modify rsync to use new key.
 - check out file permissions deal for the diagnostics logger.
 - copy new setup files or at least everything I can onto a thumb drive.
 
To Bring:
- tool bags & voltmeter
- crescent wrench (cheap ubolt nuts)
 - 7/16 nut driver (for the 1/4" hardware)
 - 1/4" drill bit & drill (for drilling out the holes if needed)
 - 7/16" wrench (for the 1/4" hardware
 - knife (for cutting old spicing tape off
 - rubber splicing tape
 - black electrical tape
 
 - field book
 
To Buy:
- 1/4" hardware X 8 pieces (1" x 1/4-20 nylock, bolt, washers)
 
For the new computer setup:
ip=$(cat junk1_ip) scp -C -P8000 -i junk.id_rsa data.dat frank@$ip:~/data/
To check on the antenna signal:
sudo apt-get install wavemon iwconfig