Difference between revisions of "NGEE"
Jump to navigation
Jump to search
(→Notes) |
(→Trips) |
||
Line 31: | Line 31: | ||
* [[March 2014 Barrow]] | * [[March 2014 Barrow]] | ||
* [[August 2014 Barrow]] | * [[August 2014 Barrow]] | ||
+ | * [[NGEE December 2014 Barrow]] | ||
* [[NGEE Barrow Remainder Items]] | * [[NGEE Barrow Remainder Items]] | ||
* [[CPCRW 2012-10-12]] | * [[CPCRW 2012-10-12]] | ||
* [[CPCRW 2013-07-15]] | * [[CPCRW 2013-07-15]] |
Revision as of 09:48, 3 December 2014
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- Programs:
- NGEE Site A Instrumentation History
- NGEE Site B Instrumentation History
- NGEE Site C Instrumentation History
- NGEE Site D Instrumentation History
- NGEE Backup Instrumentation
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 404; BRW_Grid = 403
Lists
Trips
- NGEE April 11 2012 Trip
- NGEE September 3 2012 Trip
- NGEE September 24 2012 Trip
- NGEE Barrow Wiring Layout
- NGEE Barrow Intensive Sites Initial Wiring
- NGEE Barrow 2013 Boring Trip
- [NGEE Barrow 2013 Site Install Trip 5/7
- NGEE Barrow 2013 Site Install Trip June
- NGEE Barrow 2013 Site D Install Trip August 2013
- March 2014 Barrow
- August 2014 Barrow
- NGEE December 2014 Barrow
- NGEE Barrow Remainder Items
- CPCRW 2012-10-12
- CPCRW 2013-07-15