NGEE September 24 2012 Trip
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
		
		
		
		
		
		
	
Sep field work 2012
- Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
 - Arrive on the evening on Monday Sep 24.
 - People: Bob B, Anna L, Sasha K
 
Itinerary
Tasks
- download and maintain Campbell logger
- change program to make it table data compatible
 - load new OS
 - set pakbus ID to 404
 
 - Installation of additional CSI snow depth (4)
- need to add an extra sensor to one of the sites
 - I have the sensors, A & S have the rest of the parts
 
 - move webcam 90 degrees:
- short unistrut pieces (need to cut from stock in prep room)
 - four bolts
 - two angle pieces (four hole)
 - four strut nuts
 - sawzall packed
 - climbing harness
 
 - set up base radio & usb to serial
- bring a few components from Fairbanks
 
 
Oh, I was thinking for the base radio to bring the sawzall, cut the rusted ubolts on the tower and then hose clamp a new pipe in place for the base antenna
From my field book:
- Seal 3" Pipes
 - serial cable to C (bring from FAI)
 - null modem to A (at the control shed)
 - animal proof A
 - tarps to B & C
 - NRS to C
 - mount antenna and set up rad network
 - TC probes @ C need extending
 - Need to get #5 thermal conductivity S/N at C (maybe hold off till I wire them in?)
 - Need to look at what a good value for heat flux looks like prior to the trip
 
Potential Extra Items
- Install power from Control Shed to site C (I am not sure the power is available to us??)
 - Install wireless communication to grid site (requires power)