Sep field work 2012
- Proposed dates: Arrival evening Sunday Sep 23, departure Friday evening Sep 30th.
 - Busey could also arrive on the evening on Monday Sep 24.
 - People: Bob Busey, Anna Liljedahl (Cathy may be around from Sep 28 or soon after)
 
Itinerary
DAY 1 ( 1 person)
- Water level wells @ all sites
- lowering installed wells
 - clean each wire/sensor
 - manually measure the water level in installed wells
 - download data from water level loggers
 - thaw depths at installed wells
 
 
DAY 2 and 3 (2 people)
- Water level wells @ all sites
- level surveying of water levels/wells (*** WE NEED TO FIND A LEVEL***)
 
 
DAY 4 (2 people)
- Temperature/soil moisture @ grid site (Site C)
- download and maintain Campbell logger
 - download all 20 Hobo loggers
 - replace malfunctioning Hobo loggers
 - thaw depths at the 29 sites
 
 
DAY 5 and 6 (2 people)
- thaw depth survey along transects/grids at each site (site A through D)
- CRAIG, SUSAN'S TEAM, NEED TO DGPS THAW DEPTH TRANSECTS
 
 - change the view of the webcam at the Control Shed
 
DAY 7 (2 people)
- Installation of additional CSI snow depth, Hobo soil temp and Hobo snow temp sensors
 
Potential Extra Items
- Install power from Control Shed to site C (I am not sure the power is available to us??)
 - Install wireless communication to grid site (requires power)