Difference between revisions of "NGEE Nome April 2016 pt 1 Bonus Notes"
Jump to navigation
Jump to search
imported>Bob |
imported>Bob |
||
| Line 1: | Line 1: | ||
| − | |||
| − | |||
| − | |||
| − | |||
* pipe | * pipe | ||
| − | * | + | * 2 pieces of 5ft w/ |
| − | * | + | * 6pcs -- 1.5" x 1/4-20 bolts for |
* should refresh on the pin outs for the iridium. | * should refresh on the pin outs for the iridium. | ||
| + | |||
| + | |||
| + | Station Tripod setup: | ||
| + | * survey tripod | ||
| + | * 1 pcs 1/2 height unistrut bolted to survey tripod using: | ||
| + | ** 2 pcs 1/4" fender washer | ||
| + | ** 2pcs 1/4" unistrut nut deals | ||
| + | ** 2 pcs 1.5" x 1/4-20 bolts | ||
| + | * 1" horizontal pipe cut to 2 5' sections and coupled in middle | ||
| + | * secure horizontal pipe to unistrut using two u-bolts | ||
| + | * | ||
| + | |||
| + | To buy for tripod station: | ||
| + | * 2 pcs 10' x 1" stick of conduit for horizontals | ||
| + | * 2 pcs 10' x 3/4" metal conduit for verticals | ||
| + | * 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred) | ||
| + | * 6 pcs -- 1.5" x 1/4-20 bolts | ||
| + | |||
| + | Prep work still to go: | ||
| + | * finalize survival stuff | ||
| + | * | ||
Revision as of 21:43, 29 March 2016
- pipe
- 2 pieces of 5ft w/
- 6pcs -- 1.5" x 1/4-20 bolts for
- should refresh on the pin outs for the iridium.
Station Tripod setup:
- survey tripod
- 1 pcs 1/2 height unistrut bolted to survey tripod using:
- 2 pcs 1/4" fender washer
- 2pcs 1/4" unistrut nut deals
- 2 pcs 1.5" x 1/4-20 bolts
- 1" horizontal pipe cut to 2 5' sections and coupled in middle
- secure horizontal pipe to unistrut using two u-bolts
To buy for tripod station:
- 2 pcs 10' x 1" stick of conduit for horizontals
- 2 pcs 10' x 3/4" metal conduit for verticals
- 2 pcs 2" dia x 3" long x 5/6" u-bolt (stainless preferred)
- 6 pcs -- 1.5" x 1/4-20 bolts
Prep work still to go:
- finalize survival stuff