===Second Trip:=== | ===Second Trip:=== | ||
'''August 11 - 19''' | '''August 11 - 19''' | ||
+ | |||
+ | ===pre eve trip to do === | ||
+ | * prepare data/power/ground common connections for SDI devices | ||
+ | * prepare HMP155 cables for old sites. | ||
+ | |||
+ | ===To Purchase=== | ||
+ | * One Compact flash card for CFM100 | ||
===Second Trip To Do List:=== | ===Second Trip To Do List:=== | ||
+ | ====Teller==== | ||
* @ Teller | * @ Teller | ||
** [[Teller Lower Station]] turn into full met 3m tripod located closer to shrubs | ** [[Teller Lower Station]] turn into full met 3m tripod located closer to shrubs | ||
*** soil pit | *** soil pit | ||
− | *** 1.5m soil | + | **** soil moisture @ 5, 10, 20, 30, 40 cm bgs |
− | *** | + | **** soil thermal conductivity @ 10, 20, 30, 40 cm bgs |
− | *** radiation | + | **** soil temperature @ 10, 20, 30, 40 cm bgs |
− | *** | + | **** soil heat flux near base of active layer & plant / soil boundary |
− | *** | + | **** take 2-3 soil samples from this pit for soil moisture testing |
− | *** 3m | + | *** 1.5m soil temperature profile |
− | *** | + | *** snow depth @ tripod |
+ | *** snow depth away from tripod | ||
+ | *** interval camera | ||
+ | *** 4 component radiation | ||
+ | *** Spectral response sensors: NDVI & PRI up looking and two vegetation communities | ||
+ | *** 1.5m Air temperature, Relative Humidity, & Dew Point Temperature | ||
+ | *** Wind speed and direction at 3m | ||
+ | *** summer precipitation | ||
+ | **** bring out self tapping screw to keep animals from removing precip bucket lid. | ||
** Surface Water Station #1 | ** Surface Water Station #1 | ||
− | *** Bring out CR200 | + | *** Bring out CR200 (May go with CR800 if Ross can't get the data retrieval program working with the CR200... then CR200 for next year). |
+ | **** another reason to go CR800 is that this could become the satellite base and there wouldn't be the pinch on the control ports. | ||
*** Connect two Pressure Transducers to this CR200 | *** Connect two Pressure Transducers to this CR200 | ||
− | *** | + | *** Readdress them to 1 & 0 from 0 & 0 |
+ | *** From temporary top site bring down for SW station: | ||
+ | **** instrument box | ||
+ | **** battery | ||
+ | **** solar panel | ||
+ | **** charge controller | ||
** [[Teller Upper Station ]] | ** [[Teller Upper Station ]] | ||
*** soil pit in the low area | *** soil pit in the low area | ||
− | *** | + | **** soil moisture @ 5, 10, 20, 30, 40 cm bgs |
− | *** | + | **** soil thermal conductivity @ 10, 20, 30, 40 cm bgs |
− | *** | + | **** soil temperature @ 10, 20, 30, 40 cm bgs |
− | *** | + | **** soil heat flux near base of active layer & plant / soil boundary |
− | ** | + | **** take 2-3 soil samples from this pit for soil moisture testing |
+ | *** 1.5m soil temperature profile | ||
+ | *** snow depth @ tripod | ||
+ | *** snow depth away from tripod | ||
+ | *** interval camera | ||
+ | *** 4 component radiation | ||
+ | *** 1.5m Air temperature, Relative Humidity, & Dew Point Temperature | ||
+ | *** Wind speed and direction at 3+m | ||
+ | *** summer precipitation | ||
+ | *** super animal protect this site. | ||
− | + | ====Teller Extras:==== | |
− | * | + | * Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site. |
− | ** | + | * Survey in temporary and permanent tripods / instrumentation |
+ | * Discharge measurement @ bottom | ||
− | + | ====Existing Site @ Kougarok==== | |
− | ** | + | * '''K Met''' |
− | ** Level radiometers | + | ** Tower change size reduction |
− | ** level precip | + | ** To bring: |
− | ** | + | *** pipe cutter |
+ | *** replacement bolts for tower sections | ||
+ | *** rope along | ||
+ | ** complicators (I think Council will be slightly simpler) | ||
+ | *** unistrut at base | ||
+ | *** tower sinking into muck | ||
+ | *** instrument box with all instruments at base | ||
+ | *** cross arms & junk hanging off structure | ||
+ | ** Level radiometer platform & then radiometers | ||
+ | ** To bring: | ||
+ | *** dog anchor (I think we used a dog anchor last summer actually... this will be the see the results of that check) | ||
+ | *** cable cutter | ||
+ | *** additional cable thimbles | ||
+ | *** tools | ||
+ | *** sketch out could we use like a solid unistrut arm rather than the cable | ||
+ | ** level precip bucket | ||
+ | *** level | ||
+ | ** Snow sensor replacement | ||
+ | *** SR50A w/ address 0 | ||
+ | ** Refresh AT/RH sensors | ||
+ | *** program change | ||
+ | ** check if Anemometers are still within specification | ||
+ | ** replace snow sensors | ||
+ | ** download data off storage module (there is a setting to be accessed in LN setup) | ||
+ | ** only planning to visit 10 meter tower and Mauze Gulch (up from bridge) | ||
+ | ** bring out new battery | ||
+ | ** copy of permit or # on metal tag? | ||
+ | * '''K3 Mauze Gulch''' | ||
+ | ** bring out new battery | ||
+ | ** bring out SR50A w/ address 0 | ||
+ | ** copy of permit or # on metal tag? | ||
+ | ** level precip bucket | ||
+ | *** level | ||
+ | ** Refresh AT/RH sensors | ||
+ | *** program change | ||
+ | ** check if Anemometers are still within specification | ||
+ | * @ airport conex | ||
+ | ** see about drilling a hole in the unit so a radio / satellite base can be setup... or think about this for K2 | ||
− | + | ==== Existing Sites @ Council==== | |
+ | * Blueberry Hill | ||
** Remove lowest section of Tower? @ blueberry hill | ** Remove lowest section of Tower? @ blueberry hill | ||
** Level radiometers | ** Level radiometers | ||
+ | *** pretty sure no dog anchor here but could look into it... | ||
+ | *** oh, could try 1/2 unistrut plus the small ubolts | ||
** level precip buckets | ** level precip buckets | ||
− | ** | + | ** Refresh AT/RH sensors |
− | ** spend | + | ** check if Anemometers are still within specification |
− | + | ** download data | |
− | ** put in ground control point | + | ** spend two nights with Mike Murphy to maximize field time |
+ | ** put in ground control point & log position overnight | ||
+ | ** Bring out new battery | ||
+ | |||
+ | * Existing Skookum Pass Repeater site | ||
+ | ** Switch old data logger out for CR800 and | ||
+ | ** if time install redundant satellite link | ||
+ | ** bring up two batteries | ||
+ | |||
+ | * Existing Anvil Mountain Repeater site | ||
+ | ** bring up two batteries | ||
+ | ** Change AT/RH/DP out for simpler Air temperature only | ||
− | |||
− | |||
− | |||
− | |||
− | |||
====8/11==== | ====8/11==== | ||
* Arrive @ around Noon | * Arrive @ around Noon | ||
− | * Pick up vehicle | + | * Pick up vehicle. confirmation number 39289 |
* Pick up freight | * Pick up freight | ||
* Visit Anvil Mountain and swap out batteries. | * Visit Anvil Mountain and swap out batteries. | ||
Line 61: | Line 139: | ||
** bring teller coded gear to Bering Air | ** bring teller coded gear to Bering Air | ||
− | ====8/12 | + | ====8/12 - 8/14 or 15==== |
'''(I think this may take more than two days)'''<br/> | '''(I think this may take more than two days)'''<br/> | ||
'''Starting to think 1.5 -2 days per site is more realistic''' | '''Starting to think 1.5 -2 days per site is more realistic''' | ||
* Go to Teller | * Go to Teller | ||
* @Top Put up permanent site | * @Top Put up permanent site | ||
− | ** | + | ** see above for instrumentation etc |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* @ SW station | * @ SW station | ||
− | ** | + | ** see above for instrumentation etc |
− | |||
* @ Snowmelt Logger | * @ Snowmelt Logger | ||
− | ** | + | ** see above for instrumentation etc |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* Use Survey GPS to lock in positions of all instrumentation (before move and after!) | * Use Survey GPS to lock in positions of all instrumentation (before move and after!) | ||
* Make a discharge measurement | * Make a discharge measurement | ||
− | * Level | + | * Level precipitation gage |
* Bring a drill & self-tapping screw to lock tipping bucket in place. | * Bring a drill & self-tapping screw to lock tipping bucket in place. | ||
Line 118: | Line 157: | ||
* '''FUEL UP!!!!''' | * '''FUEL UP!!!!''' | ||
* If the weather cooperates, hike up and visit the Kigluaiks Sites | * If the weather cooperates, hike up and visit the Kigluaiks Sites | ||
− | ** optional | + | ** optional / cancel if behind schedule... |
** download data | ** download data | ||
** reorient antenna if needed | ** reorient antenna if needed | ||
− | |||
* Plan A: Recon the Kougarok site | * Plan A: Recon the Kougarok site | ||
− | * Plan B: save Kougarok_m64 site for '17 | + | * Plan B: save Kougarok_m64 site for '17 |
+ | * Plan C: put some instruments @ Pilgrim hot springs? | ||
* @Kougarok_m64 | * @Kougarok_m64 | ||
− | * | + | * see above for instrumentation etc |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* @ K2 Met | * @ K2 Met | ||
− | |||
** grab data off the storage module | ** grab data off the storage module | ||
** sensor refresh | ** sensor refresh | ||
− | |||
− | |||
** Battery | ** Battery | ||
− | |||
* @ K3 Mauze Gulch | * @ K3 Mauze Gulch | ||
** Sensor refresh | ** Sensor refresh | ||
*** AT/RH | *** AT/RH | ||
*** SR50A | *** SR50A | ||
− | *** Battery | + | *** Battery |
** Data Download | ** Data Download | ||
− | + | * Camping Schedule on ideal itinerary | |
− | * Camping Schedule | ||
− | |||
** 8/15: Kougarok Cabin | ** 8/15: Kougarok Cabin | ||
** 8/16: Kougarok Cabin | ** 8/16: Kougarok Cabin | ||
====8/17 - 8/18==== | ====8/17 - 8/18==== | ||
− | * Drive back to Nome | + | * Drive back to Nome |
+ | * '''FUEL UP!!!!''' | ||
+ | * Drive out to Council | ||
* Spend two nights @ B&B. | * Spend two nights @ B&B. | ||
* Focus on C2 Blueberry site & Tower. | * Focus on C2 Blueberry site & Tower. | ||
* make the radiation stand more solid. | * make the radiation stand more solid. | ||
− | * | + | * Reduce the tower to 2 sections |
− | ** | + | |
+ | ====8/19==== | ||
+ | * Return to Nome | ||
+ | * On way stop by Skookum Pass repeater | ||
+ | * Fix as noted above. | ||
+ | * Ship anything in need of shipping | ||
+ | ** crab? | ||
+ | * depart for Fairbanks in evening | ||
+ | |||
+ | ===To bring MISC=== | ||
+ | *anti seize goop | ||
+ | *camping gear | ||
+ | *putty for boxes | ||
+ | * rope-a-long | ||
+ | |||
+ | ===Hydra Probe notes === | ||
+ | ** ID 0 = 5cm = red | ||
+ | ** ID 1 = 10cm = orange | ||
+ | ** ID 2 = 20cm = purple | ||
+ | ** ID 3 = 30cm = brown | ||
+ | ** ID 4 = 40cm = black | ||
+ | ===VATP notes=== | ||
+ | *bringing 2 drill bits (different tips), two extensions (different lengths), and two connectors | ||
+ | *also need to bring wrenches | ||
+ | *drill in UAF Nome storage | ||
+ | *when installing VATP, remove upper veg layer, drill a hole, install VATP, cut a slit in upper layer to place back around installed probe | ||
+ | *use white duct tape to secure probe to conduit | ||
===Anemometer notes === | ===Anemometer notes === | ||
Line 185: | Line 232: | ||
*** 33821 all within 1 degree of accuracy | *** 33821 all within 1 degree of accuracy | ||
*** 61996 reads 3 degrees less (ex: reads 177 when should be 180) | *** 61996 reads 3 degrees less (ex: reads 177 when should be 180) | ||
− | + | ||
+ | ===Outstanding To Do Items=== | ||
+ | * Grab remaining bolts for upper tripod | ||
+ | * cut unistrut for green box to upper tripod interface | ||
+ | * sort hose clamps for: | ||
+ | ** teller upper snow stand | ||
+ | ** teller upper precip stand | ||
+ | ** teller lower precip stand | ||
+ | ** any others... | ||
+ | ** solder extensions for TL Upper & TL Lower snow stand SR50A cable | ||
+ | ** set up terminal blocks for SDI instruments (power, data, ground) | ||
+ | ** heat flux constants: | ||
+ | *** S/N 7880: 55.58 uV/(W/m^-2) | ||
+ | *** S/N 7878: 59.63 uV/(W/m^-2) | ||
+ | *** S/N 12090: 62.88 uV/(W/m^-2) (TL Upper) | ||
+ | *** S/N 12121: 63.39 uV/(W/m^-2) (TL Lower) | ||
+ | ** Bring precision resistors | ||
+ | ** toolbag | ||
+ | ** solder HMP155 extensions for old sites | ||
+ | ** pack up RM Young hardware | ||
+ | ** Rope-a-long | ||
+ | |||
+ | ** CF Card for CFM100(s) | ||
+ | |||
+ | |||
+ | |||
+ | * |
Latest revision as of 17:59, 10 August 2016
Contents
Second Trip:
August 11 - 19
pre eve trip to do
- prepare data/power/ground common connections for SDI devices
- prepare HMP155 cables for old sites.
To Purchase
- One Compact flash card for CFM100
Second Trip To Do List:
Teller
- @ Teller
- Teller Lower Station turn into full met 3m tripod located closer to shrubs
- soil pit
- soil moisture @ 5, 10, 20, 30, 40 cm bgs
- soil thermal conductivity @ 10, 20, 30, 40 cm bgs
- soil temperature @ 10, 20, 30, 40 cm bgs
- soil heat flux near base of active layer & plant / soil boundary
- take 2-3 soil samples from this pit for soil moisture testing
- 1.5m soil temperature profile
- snow depth @ tripod
- snow depth away from tripod
- interval camera
- 4 component radiation
- Spectral response sensors: NDVI & PRI up looking and two vegetation communities
- 1.5m Air temperature, Relative Humidity, & Dew Point Temperature
- Wind speed and direction at 3m
- summer precipitation
- bring out self tapping screw to keep animals from removing precip bucket lid.
- soil pit
- Surface Water Station #1
- Bring out CR200 (May go with CR800 if Ross can't get the data retrieval program working with the CR200... then CR200 for next year).
- another reason to go CR800 is that this could become the satellite base and there wouldn't be the pinch on the control ports.
- Connect two Pressure Transducers to this CR200
- Readdress them to 1 & 0 from 0 & 0
- From temporary top site bring down for SW station:
- instrument box
- battery
- solar panel
- charge controller
- Bring out CR200 (May go with CR800 if Ross can't get the data retrieval program working with the CR200... then CR200 for next year).
- Teller Upper Station
- soil pit in the low area
- soil moisture @ 5, 10, 20, 30, 40 cm bgs
- soil thermal conductivity @ 10, 20, 30, 40 cm bgs
- soil temperature @ 10, 20, 30, 40 cm bgs
- soil heat flux near base of active layer & plant / soil boundary
- take 2-3 soil samples from this pit for soil moisture testing
- 1.5m soil temperature profile
- snow depth @ tripod
- snow depth away from tripod
- interval camera
- 4 component radiation
- 1.5m Air temperature, Relative Humidity, & Dew Point Temperature
- Wind speed and direction at 3+m
- summer precipitation
- super animal protect this site.
- soil pit in the low area
- Teller Lower Station turn into full met 3m tripod located closer to shrubs
Teller Extras:
- Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site.
- Survey in temporary and permanent tripods / instrumentation
- Discharge measurement @ bottom
Existing Site @ Kougarok
- K Met
- Tower change size reduction
- To bring:
- pipe cutter
- replacement bolts for tower sections
- rope along
- complicators (I think Council will be slightly simpler)
- unistrut at base
- tower sinking into muck
- instrument box with all instruments at base
- cross arms & junk hanging off structure
- Level radiometer platform & then radiometers
- To bring:
- dog anchor (I think we used a dog anchor last summer actually... this will be the see the results of that check)
- cable cutter
- additional cable thimbles
- tools
- sketch out could we use like a solid unistrut arm rather than the cable
- level precip bucket
- level
- Snow sensor replacement
- SR50A w/ address 0
- Refresh AT/RH sensors
- program change
- check if Anemometers are still within specification
- replace snow sensors
- download data off storage module (there is a setting to be accessed in LN setup)
- only planning to visit 10 meter tower and Mauze Gulch (up from bridge)
- bring out new battery
- copy of permit or # on metal tag?
- K3 Mauze Gulch
- bring out new battery
- bring out SR50A w/ address 0
- copy of permit or # on metal tag?
- level precip bucket
- level
- Refresh AT/RH sensors
- program change
- check if Anemometers are still within specification
- @ airport conex
- see about drilling a hole in the unit so a radio / satellite base can be setup... or think about this for K2
Existing Sites @ Council
- Blueberry Hill
- Remove lowest section of Tower? @ blueberry hill
- Level radiometers
- pretty sure no dog anchor here but could look into it...
- oh, could try 1/2 unistrut plus the small ubolts
- level precip buckets
- Refresh AT/RH sensors
- check if Anemometers are still within specification
- download data
- spend two nights with Mike Murphy to maximize field time
- put in ground control point & log position overnight
- Bring out new battery
- Existing Skookum Pass Repeater site
- Switch old data logger out for CR800 and
- if time install redundant satellite link
- bring up two batteries
- Existing Anvil Mountain Repeater site
- bring up two batteries
- Change AT/RH/DP out for simpler Air temperature only
8/11
- Arrive @ around Noon
- Pick up vehicle. confirmation number 39289
- Pick up freight
- Visit Anvil Mountain and swap out batteries.
- Get groceries
- Pack vehicle for 8/12
- Pick up freight
- bring teller coded gear to Bering Air
8/12 - 8/14 or 15
(I think this may take more than two days)
Starting to think 1.5 -2 days per site is more realistic
- Go to Teller
- @Top Put up permanent site
- see above for instrumentation etc
- @ SW station
- see above for instrumentation etc
- @ Snowmelt Logger
- see above for instrumentation etc
- Use Survey GPS to lock in positions of all instrumentation (before move and after!)
- Make a discharge measurement
- Level precipitation gage
- Bring a drill & self-tapping screw to lock tipping bucket in place.
8/14 - 8/16
- FUEL UP!!!!
- If the weather cooperates, hike up and visit the Kigluaiks Sites
- optional / cancel if behind schedule...
- download data
- reorient antenna if needed
- Plan A: Recon the Kougarok site
- Plan B: save Kougarok_m64 site for '17
- Plan C: put some instruments @ Pilgrim hot springs?
- @Kougarok_m64
- see above for instrumentation etc
- @ K2 Met
- grab data off the storage module
- sensor refresh
- Battery
- @ K3 Mauze Gulch
- Sensor refresh
- AT/RH
- SR50A
- Battery
- Data Download
- Sensor refresh
- Camping Schedule on ideal itinerary
- 8/15: Kougarok Cabin
- 8/16: Kougarok Cabin
8/17 - 8/18
- Drive back to Nome
- FUEL UP!!!!
- Drive out to Council
- Spend two nights @ B&B.
- Focus on C2 Blueberry site & Tower.
- make the radiation stand more solid.
- Reduce the tower to 2 sections
8/19
- Return to Nome
- On way stop by Skookum Pass repeater
- Fix as noted above.
- Ship anything in need of shipping
- crab?
- depart for Fairbanks in evening
To bring MISC
- anti seize goop
- camping gear
- putty for boxes
- rope-a-long
Hydra Probe notes
- ID 0 = 5cm = red
- ID 1 = 10cm = orange
- ID 2 = 20cm = purple
- ID 3 = 30cm = brown
- ID 4 = 40cm = black
VATP notes
- bringing 2 drill bits (different tips), two extensions (different lengths), and two connectors
- also need to bring wrenches
- drill in UAF Nome storage
- when installing VATP, remove upper veg layer, drill a hole, install VATP, cut a slit in upper layer to place back around installed probe
- use white duct tape to secure probe to conduit
Anemometer notes
Testing each anemometer for
- propeller torque using anemometer torque disc (18310)
- factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)
- 33821 moved with 0.2 gm-cm (a black nylon screw at 2cm radius), so this is much better than factory spec
- 61996 moved with 0.5 gm-cm
- tested both Clock Wise(CW) and Counter Clock Wise (CCW)
- factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)
- Wind speed using anemometer drive (18802)
- @200rpm = 0.98m/s. @1000rpm = 4.9m/s. @2000rpm = 9.8m/s
- tested both CW and CCW
- Vane Torque using Vane Torque Gauge (18331)
- mount the gauge, pull the string, if it moves with < 30 gm-cm of torque, golden.
- tested both CW and CCW
- Wind Direction using Vane Angle Fixture Tower Mount (18212)
- checked 3 directions
- 33821 all within 1 degree of accuracy
- 61996 reads 3 degrees less (ex: reads 177 when should be 180)
- checked 3 directions
Outstanding To Do Items
- Grab remaining bolts for upper tripod
- cut unistrut for green box to upper tripod interface
- sort hose clamps for:
- teller upper snow stand
- teller upper precip stand
- teller lower precip stand
- any others...
- solder extensions for TL Upper & TL Lower snow stand SR50A cable
- set up terminal blocks for SDI instruments (power, data, ground)
- heat flux constants:
- S/N 7880: 55.58 uV/(W/m^-2)
- S/N 7878: 59.63 uV/(W/m^-2)
- S/N 12090: 62.88 uV/(W/m^-2) (TL Upper)
- S/N 12121: 63.39 uV/(W/m^-2) (TL Lower)
- Bring precision resistors
- toolbag
- solder HMP155 extensions for old sites
- pack up RM Young hardware
- Rope-a-long
- CF Card for CFM100(s)