Difference between revisions of "2016 NGEE September Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 43: Line 43:
 
===Council Old Sites===
 
===Council Old Sites===
 
* Look for camera at Blueberry site
 
* Look for camera at Blueberry site
 +
* replace antenna & coax @ blueberry site

Revision as of 19:54, 5 September 2016

Teller Bottom @ TL_DS_1

To Do:

  • Get SRS sensors running
  • Get Thermal Conductivity sensors running
  • Jumper for batteries
  • Pack up Surface Water Station for winter
  • Duct seal up all instrument box holes
  • Final Discharge Measurement of season

In Nome Storage:

  • jumpers for last battery
  • soil sampling cylinders for soil pit
  • Cable spools for Pressure transducers

At Site

  • duct seal for all connections
  • soil pit sensors in large actionpacker

Extras

  • think about how to mount iridium here...
  • Bring covers from Fairbanks to cover unitstrut ends like tennis balls.

Left to fix

  • Decagon SRS sensors... test again in Fairbanks
  • Thermal Conductivity sensors... figure out their deal...
  • Review fieldbook

Teller Top @ TL_IS5

Remaining To Do for fall

  • Bring out a charge controller for solar panel
  • soil samples from soil pit
  • soil pit sensors are in a large actionpacker next to tower.

Kougarok M64

  • Add ground control survey point if permitted

Skookum Pass

  • Add Satellite Components

Kougarok Old Sites

  • Download data over the radio network

Council Old Sites

  • Look for camera at Blueberry site
  • replace antenna & coax @ blueberry site