Trip Recap
- Got Pits in at Teller top & Bottom
- ran out of laptop battery, need to correct one more program error at teller bottom site in spring, program fixed on toughbook but not yet on logger.
 
 - Installed ground control at Kougarok & logged for several hours
 - Surveyed in a bunch of stuff in Council
 - Surveyed in soil pits etc in Teller
 - downloaded data from all 4 Kougarok area
 
Fairbanks
To Buy:
- machine screws for sat transceiver
 
Teller Bottom @ TL_DS_1
To Do:
- Get Thermal Conductivity sensors running
 - Jumper for batteries
 - Pack up Surface Water Station for winter
 - Duct seal up all instrument box holes
 - Final Discharge Measurement of season
 - serial numbers
 
In Nome Storage:
- jumpers for last battery
 - soil sampling cylinders for soil pit
 - Cable spools for Pressure transducers
 - wading rod & cloth tape for discharge measurement
 
At Site
- duct seal for all connections
 - soil pit sensors in large actionpacker
 
Extras
- think about how to mount iridium here...
 - Bring covers from Fairbanks to cover unitstrut ends like tennis balls.
 
Left to fix
- Decagon SRS sensors... test again in Fairbanks
 - Thermal Conductivity sensors... figure out their deal...
- Check out the wiring. Specifically, the original program guidance has a typo
 - VX3 should be wired to SE11 but program says to SE12. (maybe... in any case, double-check)
 - I have a single working here measuring temperature properly.
 
 - Review fieldbook
 
Teller Top @ TL_IS5
Remaining To Do for fall
- Bring out a charge controller for solar panel
 - soil samples from soil pit
 - soil pit sensors are in a large actionpacker next to tower.
 
Kougarok M64
- Add ground control survey point
 
Skookum Pass
- Add Satellite Components
 
Kougarok Old Sites
- Download data over the radio network
 
Council Old Sites
- Look for camera at Blueberry site
 - replace antenna & coax @ blueberry site
 - cross river by inflatable if water level is cooperative.
 
For Datapro:
Add a PRI / NDVI Function:
- NDVI = (DownNIR/UpNIR - DownRed/UpRed)/(DownNIR/UpNIR + DownRed/UpRed)