Difference between revisions of "2016 NGEE September Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 +
===Fairbanks===
 +
====To Buy:====
 +
** machine screws for
 
===Teller Bottom @ TL_DS_1===
 
===Teller Bottom @ TL_DS_1===
 
====To Do:====
 
====To Do:====
* Get SRS sensors running
 
 
* Get Thermal Conductivity sensors running
 
* Get Thermal Conductivity sensors running
 
* Jumper for batteries
 
* Jumper for batteries

Revision as of 20:37, 5 September 2016

Fairbanks

To Buy:

    • machine screws for

Teller Bottom @ TL_DS_1

To Do:

  • Get Thermal Conductivity sensors running
  • Jumper for batteries
  • Pack up Surface Water Station for winter
  • Duct seal up all instrument box holes
  • Final Discharge Measurement of season
  • serial numbers

In Nome Storage:

  • jumpers for last battery
  • soil sampling cylinders for soil pit
  • Cable spools for Pressure transducers
  • wading rod & cloth tape for discharge measurement

At Site

  • duct seal for all connections
  • soil pit sensors in large actionpacker

Extras

  • think about how to mount iridium here...
  • Bring covers from Fairbanks to cover unitstrut ends like tennis balls.

Left to fix

  • Decagon SRS sensors... test again in Fairbanks
  • Thermal Conductivity sensors... figure out their deal...
  • Review fieldbook

Teller Top @ TL_IS5

Remaining To Do for fall

  • Bring out a charge controller for solar panel
  • soil samples from soil pit
  • soil pit sensors are in a large actionpacker next to tower.

Kougarok M64

  • Add ground control survey point if permitted

Skookum Pass

  • Add Satellite Components

Kougarok Old Sites

  • Download data over the radio network

Council Old Sites

  • Look for camera at Blueberry site
  • replace antenna & coax @ blueberry site